The Company

 

HC Manufacturing Sdn Bhd was incorporated on 8th July 2002 with an intended activities of manufacturing, processing and supplying of concrete pre-cast components and its related products.

In March 2008, the company acquired a 21 acres piece of land in Rasa and set up its manufacturing facilities. Phase 1 of the complex was completed within 4 months and production of the pre-cast concrete components commenced in September 2007. The current facilities is able to produce 2,000 units of single storey houses a year.

The complex was auspiciously open on 18th December 2007.

Costing
Time Frame
Brochures
Video
Interior Design

Projects

 
 

Copyright © 2024 HC Precast System. All rights reserved. Powered By OrangeSoft WebDesign.