HC PRECAST SYSTEM

 

Features & Advantages Adding Value Range of Products

Panel Installation Sequence of Panel Delivery Quality Assurance

Quality Assurance

  • Ready Mixed Concrete – Concrete Grade To Comply Engineer’s Requirements
  • Slump Test Carried Out On Every Delivery
  • Cube Test Taken For Every 20m3
  • Rebound Hammer Test Carried Out Daily & on Selected Panel
  • Lifting Of Panel Only After Minimum 18 Hours Or As Specified By Engineer
  • Panels Stored In Stock Yard For 7 Days Or As Specified By Engineer For Curing Before Delivery To Site
  • Panels Stack Individually As Opposed To One On Top Of Another To Prevent Cracks
Costing
Time Frame
Brochures
Video
Interior Design

Projects

 
 

Copyright © 2025 HC Precast System. All rights reserved. Powered By OrangeSoft WebDesign.